Landed Cost Types

Now that Clever Landed Costs has been installed you need to take the first step in setting up the app.

Use the search tool to find the Landed Cost Type page and create a a Landed Cost Type code for each Landed Cost.

You can create a Landed Cost Type per each freight provider for example. Once created these are then assigned to the item.

Enter a new line per code, adding the required information for the calculation type and the posting accounts for each Landed cost.

The first field to populate is the Landed cost type code; a code is created for each landed cost type. A landed cost type can be created for each freight provider. Landed cost types are then assigned to items.

The description field is a way for you to identify each code you have created. It also helps in understanding what each code means.

The next field along is the Calculation Type; Defines whether the expected cost is calculated based on the duty %, or the weight or volume of the item based on the item card fields. Options are Duty, Weight (KG), Volume (M3). These options can be selected by using the drop down arrow next to the field.

By populating the field Include in Duty, against each code determines whether the cost is included in the duty cost calculation. e.g if Include in Duty = TRUE for landed cost type of freight then duty amount (£) = (Base Cost + Freight Cost)*Duty%

You will need to specify an Accrual Account to say this is where the costs are accrued on receipt of the landed cost, once the cost has been invoiced the expected cost is reversed and the actual costs are posted to the landed cost ledger entries.

NB: in order for the system to post through the expected costs correctly the fields for Automatic Cost Posting and Expected Cost Posting must be enabled on your Inventory Setup page else you will not see the Landed Cost accrual postings.

You should also have a Inventory Accrual Acc (Interim) stated on your General Posting Setup for the relevant general product posting groups assigned to the items that will have landed costs as this is where the expected costs are posted on receipting the order.

Like the accrual account you need a Variance Account for each code where there is a difference between the expected cost (recorded on receipt) and actual cost on invoicing the variance is posted to this account.

NB: Both the Accrual Account and Variance Account are newly created G/L cdes specific for Clever Landed Costs. You can have a separate Accrual account per Landed Cost Type if you wish.